F.A.Q.s
Q: How long does the renovation take?
A: 10 – 14 days is the average time it takes to construct a
bathroom.
Q: Can I use the bathroom whilst it’s being renovated?
A: It is not possible to use the bathroom during the renovation
process. An on-site amenities block complete with shower toilet
and basin can be arranged if your home has one bathroom
Q: Can bathroom builders renovate other rooms in the house
i.e. Kitchens, bedrooms etc?
A: Yes, we are more than happy to renovate any room within the
home. Bathroom Builders predominately only renovates wet areas
i.e.: bathrooms. Wet areas are unlike any other
room in the home as they require a specialist construction and
design process that ensures any water that may escape the water
enclosure is contained within that room and has passage to a
drain.
Q: Does the existing plumbing determine where the shower,
bath or basin needs to be?
A: No, we can generally move the plumbing to reposition the
fixtures anywhere in the room
Q: My home is a colonial but I would like a modern styled
bathroom.
A: The bathroom is a separate room to the adjoining rooms of the
house and does not necessarily need to be in keeping with the
rest of the home’s style.
Q: I have a picture from a magazine; can you create the same
in my home?
A: Yes we can, if the bathroom pictured is of similar size and
designed correctly.